Starter Tester
Main Function:
◆Use motor imported from its origin as load, capable of achieving fixed torque control mode and fixed speed control mode, the error in speed control less than 5r and error in torque control less than 0.1 Nm.
◆Fast load control, time of control measurement in each loading point can be guaranteed within 1-2 seconds, and the whole performance curve can be completed in 10s.
◆Capable of collecting speed, voltage, current and torque in synchronization, with the whole sample rate hit 250KS/S(withsample interval of 4μs).
◆Precise measurement, the error of repeat measurement less than 0.5%.
◆Capable of comparable analysis for measured results under the same conditions thus providing an excellent platform of data analysis for engineer in starter design.
Technical parameters:
Voltage |
0~ 40V |
±0.5% |
Current |
0~3000A |
±0.5% |
No-load speed |
0~15000r/min |
±1.0% |
Loaded speed |
0~3000r/min |
±1.0% |
Torque |
0~300N.m |
±0.5% |
Starter power |
5~10kW / 8~15kW |